CegercoHome  |  Sitemap  |  Contact us  |  Extranet  |  Français  |  Español
Phone: (418) 543-6159  Email: cegerco@cegerco.com

RBQ 8003-7914-98
 Corporatif Réalisations Ressources Mode opérationnel
Injection

Injection

Watertight injection and injection in pressure discharge pipes inside the tunnel.

We modified our drilling and injection equipment in order to effectively carry out the mandate under its rather unusual conditions. Moreover, Cegerco had to provide an analysis report for the cores removed by its Geology Department.

Isle-Maligne Dam
Isle-Maligne Dam
Drilling in the tunnel
Injection work in cracks
Injection work in cracks
All rights reserved © 2009 Cegerco