Thousands of drill anchors were installed with precision on the pillars of the Chute-à-Caron Dam. This was the challenge facing Cegerco professionals.
face this challenge, hydraulic drills were designed to run on rails on be operated remotely. This method enabled Alcan to make substantial savings in carrying out this work.