STM Cote Vertu
Garage concreting and other civil works
Project description
In November 2020, the STM stopped work on the Garage Côte Vertu because it was unable to reach an agreement with the incumbent contractor. Following this event, the Société des Transports de Montréal issued a call for tenders to complete the completion of this work, or about 10% of the structural concrete to be built.
The contract was awarded to Cegerco in March 2021, with the very specific mention of delivering the work in December 2021.
The contract was essentially divided into three sectors:
- The sector of the beam
The beam is a concrete structure 55m long x 60m wide, with a height of 19m. The work to be completed consisted of 50% of the walls on 7m high and complete the entire roof slab - The sector of the cork
This mass concrete structure is used to seal the ramp used to build the tunnel - Access and ventilation structure SA 09
The constructed structure compares to a 15m high concrete cage
The main problems encountered during the execution of this contract were the very tight schedule and the technical complexity of the rock structures designed to last 100 years.
Cegerco was able to meet this planning challenge and the technical constraints desired by the client while respecting the completion of the work planned for December 2021.
Characteristics
- Customer :
- STM - Montreal Transports Company
- Localisation :
- STM garage Cote Vertu
- Services :
- Concreting
Civil works
- Duration :
- April 2021 - December 2021
- Cost :
- $27.6 M
- Project Manager :
- Denis Fortier