Projects ongoing

Construction and refurbishment – STM Place des Arts

Montreal transport Company

Construction and redevelopment work on Place des Arts station as well as the design, supply and installation of 3 elevators, one (1) of which is optional.

Membrane, entrance and accessibility repairs – STM McGill

Montreal transport Company

The work of this contract consists of the repair of the waterproofing membrane, the addition of two (2) elevators, the construction of a new Metro entrance and the redevelopment of premises at the McGill station.

Refurbishment, Dam 11 Campbellford, Ontario – Parks and Infrastructures Canada

Parks and Infrastructures Canada - Maple Reinders/Demathieu and Bard

The modifications to Campbellford Dam 11 are intended to increase the discharge capacity and improve the safety of the dam.

Power Plant concreting – Romaine 4

The Nordex-Cegerco consortium has just been awarded the contract to complete the concreting of the Romaine 4 power plant at Hydro-Quebec.
The works will take place until 2021.

Transport of electrical and mechanical engineering – DCC: Rationalization of infrastructure

Defense Construction Canada (DCC)

Construction of two new buildings (12,300 m² and 800 m²) housing the infrastructure of the transport, electrical and mechanical engineering divisions, repair workshops, administrative areas and user services. Four buildings were also to be demolished.

Refurbisment in 3 phases – Dubuc bridge, Saguenay

Ministry of Transport, Sustainable Mobility and Electrification

The major reconstruction of the Dubuc bridge, phase 3, consists not only, as its name suggests, of the reconstruction of the Dubuc bridge, but also of the repair of 4 structures adjoining it and the demolition of the ramp entrance, south side, which gives a construction site with more than one (1) kilometer long.