ArcelorMittal (AMMC)

Description du projet

Cegerco received the mandate from ArcelorMittal Mines Canada to build two joint concrete silos for the storage of ore from the Mont-Wright mine, Fermont, Quebec.

Site preparation, in order to support the 2 joint silos, required a structural shoring slab to allow the conveyors access to the minerals under the silos. Then, the preparation and coordination of the silos, and finally, the continuous casting with a slip form, 24 hours a day for 6 days, was successfully executed.

Technical data:

  • Elevator height: 26 m
  • Diameter: 26 m
  • Wall thickness: 600 mm
  • Poured and installed concrete: 2,600 m³
  • Steel: 600 tm
Caractéristiques
Client :
ArcelorMittal Mines Canada (AMMC)
Localisation :
Mont-Wright, Fermont, Quebec
Services rendus :
Construction of two concrete silos
Durée :